Continuing to work on the fuselage main center section. Kinda slow getting back in the rhythm of building.
Decided to countersink and fill the extra holes that the factory mistakenly drilled in the center section channel.Now I don't have to look at the empty holes and don't have to worry about anyone in the future asking why they were left open.
Have to dimple these three holes only on one end of the parts. Look at the drawings to make sure which three get dimpled!
No comments:
Post a Comment