Continued working on the main center section of the fuselage.
Cleco'ed the aft bulkhead to the main center section channel.
Match reamed all the holes that are common with the main channel.
Found a mistake made by the factory. There are 6 extra holes drilled in the main channel. Support says to build on with the option to fill these with flush rivets.
And last thing for today was to machine countersink these holes, one on each side for a flush pulled rivet. Used the 120° cutter for these.