Thursday, April 6, 2023

VS Assembly Part 2

Some time lapse of the riveting of the main skin. - 2.1 man hours



Video of how the puller works,


The final rivets of the lower rear spar caps to flanges.


Time to attach the front skin

Use Boelube on the screws to prevent galling.

All done!

Left side...

Right side.....

Used the bolt gauge that came with my RV-10 kit to figure out which  bolts were being called out.

Torqued the upper hinge assembly to the spar.

 
Zip tied the lower hinge to the spar.

Finished product right side.

Finished product spar side.

Finished product left side.

Wednesday, April 5, 2023

VS Assembly Part 1

Finally time to squeeze and pull some rivets - 3.25 man hours 


Time to rivet the hinge assemblies together.


Top and bottom hinge assemblies riveted together.

Cleco the upper spar caps to the aft spar.

My first pulled rivets.




Using the wedge tools to pull the rivets close to the flange.


Works like a charm!

The shop side of the riveting.

Time to rivet the nutplates.


Using the squeezer to rivet the nutplates.

All done!

The nutplates on the front spar.


These one leg nutplates are next.

All done!

Riveting the rib to the front spar!

Next riveting the lower spar caps to the rear spar.


A ton of rivets with many requiring the wedge tool.




Spar caps done!

Riveting the other ribs to the spars.


All done!

Video on how I dimple nut plates.

Riveting the nuplates to the main skin.

All done!
Matching the skeleton with the main skin,.

I like allot of cleco's!

Cleco'd and ready to rivet.

Tuesday, April 4, 2023

Vertical Stabilizer Priming Day!

Primed all the parts for the VS today - 2.5 man hours

Used my blind hole deburr tool to deburr the VS main skin holes.  This gets both sides at once.


Scuffed and acid etched all the parts.



Hanging the parts to dry.

Mixing up the EkoPoxy primer.

First time spraying this stuff.  It went on smooth and easy.