Finalized the location of the canopy, taped it down and started drilling it to the frame today.
First I drilled the canopy frame bow in the front per the marked holes. Must drill at the angle that is perpendicular to where the bubble contacts the bow.
Taped the Poo out of the canopy so it does not move.
Used 1/8" shims at the front to ensure that gap remains constant.
Ensured that the hole is concentric with the shaft.
And started drilling with the plexi drill. Front to back and side to side.
Stopped for today because I did not want to push my luck.
No comments:
Post a Comment