Saturday, October 21, 2023

Fuselage center section #69 - Rollover bar brace and aft baggage bulkhead!

 Worked on the rollover bar brace and baggage bulkhead parts today.

Drew a line per the KAI's on these shear clips.  

Cleco'ed the baggage bulkhead parts to the tail cone.

Match drilled these shear clips to the bulkhead after centering the line in the holes.


Drilled these two holes full size.

Match drilled the fuel pump bracket to the pilot's side bulkhead rib.

Then fitted all the parts for the fuel pump mount.  Match drilled the screw holes into the bulkhead rib.


Countersunk these brackets.  Had to do these without the cage.

Dimpled all these nutplate mount holes.

Countersunk all these rivet and nutplate mount holes.

All the parts ready for primer prep.


No comments:

Post a Comment