Next I plugged the tank lines, connected the two engine fuel lines together and then pressurized the system to 45psi. I found some leaks in easy to get to places and I had also forgotten to torque the fuel filter bypass line.
Once the big leaks were fixed, I checked every connection with SNOOP (glorified soapy water). Detected a couple very small leaks and once those were fixed, the system held pressure for 24hrs.
Thankfully the two fittings that go thru the firewall behind the rudder pedals were not leaking. I used a borescope to inspect the SNOOP coated connections.
During this process, I realized that air will not flow backwards thru the pump assembly and obvious check valves. I had a leak on the suction side of the pumps and this went undetected by the original pressure gauge installed in the fuel pressure transmitter block. So I added another pressure gauge to the low point drain block. This worked great.
Next was installing the fuel line that feeds fuel to the pumps from the tank. This is a pain to install.
They have you remove the fuel pump assembly from the Rotax provided stainless steel box. Not sure if this voids the warranty or not but it has to be done.
Started working on the fuel pump area to finish off the fuel system.
First I assembled the low point drain block and temporarily installed a Schrader valve to be able to pressure check the system when I am finished.
Next was finalizing the fit of the oil door to the top cowl. (the corners are a bit non-symmetrical) Then rivet the door to the hinge and the hinge to the cowl.