Wednesday, November 15, 2023

Fuselage center section #90 - Fuel Tank part 2!

Continued the prep for the fuel tank assembly.

They have you cleco all the ribs into the top skin.  Then cleco the bottom skin onto the assy.

Then match drill these two outboard holes in the outboard ribs.

Then the fuel inlet is match drilled to the assy.  At first I cleco'ed the unit to the skin but it left a huge gap. So I removed the clecos and just held it into place while match drilling up to #30.  This virtually eliminated the gap :)
There is one hole that must be drilled and cleco'ed from the inside.

Next they have you test the fit of the fuel level indicator,

And then you bend the fuel level sender per the directions.  The sender I received was not made like the one in the KAI's.  Therefore I just made it look as close as possible to the full size template in the directions.

Next I had to countersink the nutplate attach rivet holes in the inspection cover.   Make sure the little notch is on the left of the large notch at the bottom.

Then they have you rivet the nutplates to the cover.  I only have a 2.5" yoke so two of the rivets could not be squeezed.  So instead I just back riveted those two with the rivet gun and back rivet set that I have used for prior projects.

Temporarily screwed the inspection cover onto the tank.  Also have the sender screwed to the cover.

Tweaked the sender float arm to ensure accuracy on the low end.


Tuesday, November 14, 2023

Fuselage center section #89 - Fuel Tank!

Since the fuel tank comes in the fuse kit, the fuse kit is not done until the fuel tank is done!

The KAI's have you dimple some holes that are not dimpled at the factory.  Who knows why but most of the dimples are already done by the factory.

Then they have you machine countersink the nutplate attach holes for both the fuel level indicator and the access plate which holds the fuel level sender.


These get the flush pulled rivets.  They are not as robust as the regular pulled rivets as the stem gets pulled out.

Then the access plate nutplates get riveted on with solid rivets.

Next the directions have you dimple the ribs so they mate with the skins.

Next is a whole lot of countersinking!  Make sure you make two mirror images otherwise you will be ordering new parts!

This mount tab needs a couple countersunk holes.

Then this angle piece gets riveted on.  The center hole ends up getting match drilled for a bolt.



Monday, November 13, 2023

Fuselage center section #88 - avionics deck!

Tonight I finished the avionics deck and top turtledeck skin. Riveted the instrument panel mount flanges to the top skin.  Then riveted the grab handle ribs to the top skin.



Then screwed this temporary plate that simulates the instrument panel. This stiffens everything up for canopy install etc.  It eventually gets removed and replaced by the instrument panel.

The fuselage is officially done with the exception of the fuel tank.


Next task: FUEL TANK!

Saturday, November 11, 2023

Fuselage center section #87 - avionics deck!

Started by riveting the avionics deck to the firewall.  The IS version fills one of the nutplate holes with rivets.


The other two nutplates get installed.

Next you must start assembling the oil tank/battery box brackets.

These are the first two pieces of the bracket assembly that get riveted to the firewall.

Next the side plates.
Then the horizontal ribs.

Had to fabricate this cover that gives you access to the hinge pins.

This clip gets fabricated and riveted to the closeout plate.  The hinge pins get captured by this clip.

Next the handle ribs and handle get assembled.

Two nutplates get installed to the handle.

Have to pre-bend the turtle deck skin.  Be careful not to kink the skin!

After waxing the area that gets sealant so that it won't stick to the skin, I put down a bead of sealant on the flange and then screwed the skin to the firewall and ribs.


Next I riveted all the nutplates on the upper instrument panel mount flanges.

And then cleco'ed the flanges to the upper skin.


Friday, November 10, 2023

Fuselage center section #86 - avionics deck!

Started working on the avionics deck.

Match drilled the avionics deck to the longerons.  Be careful to drill the holes and match drill with the flange that is on the vertical rib that is under the longeron.  I used a thin stainless piece to stop the drill bit after it went thru the longeron.

Other side done.
Cleco'ed the rib to the avionics deck.  Then match drilled the angle.



Then started riveting the avionics deck to the longeron.

Then riveted the rib to the deck.

And riveted the headset hangers to the underside.


Thursday, November 9, 2023

Fuselage center section #85 - Brake Lines!

 Went back and finished the brake lines because it will be easier now before the avionics shelf is installed.

Crossover lines installed.  No idea why  they have to be so long,

Riveted this attach plate.

Installed the tops and braces of the system blocks.

Routed the long brake lines that go to the gear thru the fuse center section and system blocks.