Started working on the rudder pedals today.
First was splitting these mount blocks. Just marked the center and cut em with the band saw.Sunday, October 29, 2023
Friday, October 27, 2023
Fuselage center section #75 - Seat back assembly.
Today we got some much needed but concerning communication from Van's.
https://www.vansaircraft.com/2023/10/business-announcement-from-vans-founder-dick-vangrunsven/
On this day of so much gloom and doom, I did the only thing that I could do in this situation and went out and finished my seat backs!
I’ve got a finished emp/tailcone, soon to be finished fuse, a wing kit begging to be assembled and a finish kit on order. I’m all in and trust that Vans will be around long after I am gone.
One of the few places that Van's ask the builder to double flush rivet. These turned out well since I could squeeze them.
Fabricated the seat back angle adjust rib hinge pins. Cut to length, treat the ends per the directions, bend a 90 on the end.
Installed the sliding pin assembly. Had to clean up the boss that the pin slides in and the pin itself to get this to move freely. Also used some Beolube on the pin.
Thursday, October 26, 2023
Wednesday, October 25, 2023
Fuselage center section #73 - Seat backs part 2.
Finished up the prep on the seat back parts tonight.
Assembled the parts with clecos just to drill these two holes on each side of each seatback to #12.
Tuesday, October 24, 2023
Fuselage center section #72 - Seat backs.
Got started on the seat back part prep tonight.
Marked these heavy angles to cut away the chamfer on the end. This allows clearance for the seat back to tilt forward without these angles hitting the floor.Prepped all the angles and the angle adjust rib. The heavy angles are very heavy! It took a while to clean them up and my scotchbrite wheel lost some diameter!
Then I cut these hinges. The plans call for a weird way to measure them. Screw that, waste too much material for no reason. I just measured and cut them per the length and with the eyelets per the drawing.
Next came countersinking these stiffeners. I just used the deburr tool to do this as the countersink cage will fall off the edges. Just took my time and kept checking the depth with a rivet.
Monday, October 23, 2023
Fuselage center section #71 - Rollover bar brace and aft baggage bulkhead riveting!
Riveted the remaining parts of the roll bar brace and aft baggage bulkhead tonight.
Cleco'ed the aft bulkhead ribs and supports to the rear of the baggage compartment.Sunday, October 22, 2023
Fuselage center section #70 - Rollover bar brace and aft baggage bulkhead priming!
Prepped and primed all the parts for the rollover bar brace and the aft baggage bulkhead.
Scrubbed all the parts with scotchbrite and pre-kote. Hung up to dry.
Subscribe to:
Posts (Atom)